Statutory Compliance Calendar for Employers in India

Every recurring statutory deadline in one place, from the 7th, 11th, 15th and 20th monthly anchors to quarterly TDS statements and annual returns, with a design for a master calendar that does not miss dates.

1. Executive Answers

The calendar has three layers, and each needs a different control.

LayerWhat it containsFailure mode
Recurring monthly anchors7th, 11th, 15th, 20th and State-specific datesMissed because several teams own different dates
Periodic filingsQuarterly TDS statements, half-yearly returns, annual returnsForgotten between cycles, then filed late in bulk
Event-driven and licence datesNew registrations, renewals, thresholds crossed, audits, noticesNever entered in any calendar

The recurring monthly anchors

DateAnchor
7thTDS deposit (Income-tax Act, 2025); monthly wage payment (Code on Wages)
10thProfessional Tax in some States (for example, Telangana)
11thGSTR-1 for monthly filers
15thEPF contribution and ECR; ESIC contribution; Professional Tax in some States (for example, Gujarat)
20thGSTR-3B for monthly filers; Professional Tax in some States (for example, Karnataka)
21st and laterProfessional Tax in other States (for example, West Bengal); QRMP-scheme GST dates
Month-endProfessional Tax in some States (for example, Maharashtra for larger employers), reconciliations and close

Quarterly rhythm: salary and non-salary TDS statements on 31 July, 31 October, 31 January and 31 May, and advance tax instalments on 15 June, 15 September, 15 December and 15 March.

What is due in the next 60 days (from 9 October 2026)

  • 10 October: Professional Tax in States with a 10th due date
  • 11 October: GSTR-1 for September (monthly filers)
  • 15 October: September EPF and ESIC contributions, the first cycle with the split-month Rs 25,000 ceiling computation
  • 20 October: GSTR-3B for September, and Professional Tax in States with a 20th due date
  • 31 October: Q2 salary TDS statement (Form 138) and non-salary statements (Forms 140 and 144); MSME Form 1 for April to September; income-tax return for audit cases, subject to any notified extension
  • 30 November: statutory bonus for the year ended 31 March 2026 (eight months from year-end under the Code on Wages)
  • 31 December: Maharashtra Labour Welfare Fund (second half); annual GST return (GSTR-9) for the previous financial year

The cost of calendar fragmentation. In a multi-State group, each statute is typically tracked by a different person in a different spreadsheet. The consequences are structural: duplicated effort, no single view of what is due this week, State dates missed because the team assumed the head-office State's date, and no escalation when a filing slips. The financial cost is the sum of per-statute interest and fees: 12% per annum plus graded damages on late PF, interest and a daily late fee on GST, month-wise interest on late TDS deposit, and State-specific penalties on PT and LWF. The management cost is higher: a default in one statute prompts scrutiny of the rest.

Operating rule: a statutory deadline is a system output, not a reminder. Each obligation needs an owner, a preparation date, a payment target date ahead of the legal date, an approver, and evidence of completion.

2. Scope & Applicability

2.1 National frameworks

FrameworkTriggerCalendar impact
Income-tax TDS (Sections 392 and 393)Any person paying salary, or specified payments such as contractor, professional fees and rent; TAN requiredMonthly deposit; quarterly statements; annual certificates
EPF, EPS and EDLI20 or more employees; voluntary below that; coverage for wages up to Rs 25,000 from 17 September 2026Monthly contribution and ECR by the 15th
ESIC10 or more employees; 20 or more where the State has notified the higher threshold; wages up to Rs 21,000Monthly contribution by the 15th; contribution periods April to September and October to March
GSTRegistration beyond the turnover threshold for goods or services (lower for special category States), or where registration is compulsory (inter-State supply of goods, reverse charge cases, e-commerce)Monthly or quarterly returns; annual return; reverse charge on specified inputs
Code on WagesAll employersWages by the 7th; exit dues within two working days; annual bonus (20 or more employees)
OSHWC Code10 or more workers (establishments); factories at 20 (with power) or 40 (without power); contract labour at 50 or moreRegistration and licence terms; annual and periodic returns as prescribed
POSH Act10 or more employeesInternal Committee; annual report
Companies Act, 2013Companies and LLPs (separate LLP Act)AGM, annual filings, half-yearly MSME reporting where applicable

2.2 State-specific enactments

EnactmentApplicability driverCalendar impact
Professional TaxState where the employee works; some States levy noneMonthly, quarterly or annual payment and returns, with enrolment and registration certificates in some States
Labour Welfare FundStates that have notified LWF; establishment size and amounts varyMonthly, half-yearly or annual contribution
Shops and Establishments registrationEach State's law or its successor under the OSHWC frameworkRegistration, renewals, amendments, display requirements
Factory licenceFactories by StateLicence renewal and annual return dates under State rules
Contract labour licencePrincipal employer and contractor thresholdsLicence validity, renewals, returns
Municipal and pollution consentsLocal authority and pollution control boardTrade licence and consent renewal dates

2.3 Headcount and geography triggers

  • Crossing 10 employees: ESIC (where the 10 threshold applies), OSHWC applicability, POSH Internal Committee.
  • Crossing 20 employees: EPF, statutory bonus, Grievance Redressal Committee, and ESIC where the State threshold is 20.
  • Crossing 50 contract workers: principal employer and contractor licensing.
  • Crossing 300 workers: Standing Orders and prior-permission rules for layoff, retrenchment and closure.
  • New State or location: a new PT, LWF, establishment, EPF sub-code and ESIC code set, each with its own calendar.
  • Inter-State employee posting: assess PT and LWF at the worksite State.

Each trigger is also a calendar event: when headcount or footprint crosses a threshold, the register should add the new obligations on the same day.

3. Detailed Guide

3.1 Monthly remittance windows

The 7th window: tax and wages

  • Deposit TDS deducted in the previous month (30 April for March deductions).
  • Pay monthly wages for the previous month, with electronic wage slips.

The 11th window: GST outward supplies

  • GSTR-1 for monthly filers. Quarterly filers under the QRMP scheme file on the 13th after quarter-end and pay tax monthly through the challan.

The 15th window: social security

  • Upload the ECR, generate the challan and pay EPF, EPS, EDLI and administration charges.
  • Upload the ESIC contribution file and pay.
  • Treat the 15th as the working deadline, and target payment two working days earlier.

The 20th window: GST payment and State levies

  • GSTR-3B and tax payment for monthly filers, with interest on late tax payment at 18% per annum and a daily late fee.
  • Professional Tax in States with a 20th due date.

State-specific monthly dates

  • Telangana (10th), Gujarat (15th), Karnataka (20th), West Bengal (21st) are commonly cited PT dates. Maharashtra requires monthly payment by month-end for larger employers, with different options for smaller ones. Confirm each date against the State's current notification.

Month-end: payroll-to-statutory reconciliation, ledger tie-out, evidence archive and next-month input freeze.

3.2 Quarterly cycles

TDS statements (current forms)

StatementFormQuarter 1Quarter 2Quarter 3Quarter 4
Salary138 (earlier 24Q)31 Jul31 Oct31 Jan31 May
Resident non-salary140 (earlier 26Q)31 Jul31 Oct31 Jan31 May
Non-resident144 (earlier 27Q)31 Jul31 Oct31 Jan31 May
TCS143 (earlier 27EQ)31 Jul31 Oct31 Jan31 May

Before each filing, reconcile deducted tax to challans, correct PAN and section or payment code errors, and clear TRACES default notices from previous quarters. The annual salary certificate (Form 130, earlier Form 16) is issued after the final quarter's statement, with the issue date set in the Income-tax Rules, 2026.

Advance tax: 15 June, 15 September, 15 December and 15 March, at the cumulative percentages prescribed.

GST for QRMP filers: quarterly GSTR-1 and monthly payment, with GSTR-3B on the 22nd or 24th after quarter-end depending on State grouping.

Internal quarterly reviews: contractor licence and proof review, overtime and hours analysis, safety and committee records, State rule changes.

3.3 Half-yearly cycles

  • ESIC contribution periods: April to September and October to March. Re-test wage-ceiling eligibility at the start of each period.
  • Labour Welfare Fund: half-yearly in some States (for example, Maharashtra on 30 June and 31 December).
  • Contractor and vendor returns: contractors under the legacy contract labour regime filed half-yearly returns shortly after each half-year. The OSHWC framework prescribes return formats and periodicity through its rules, so confirm the applicable return, filing window and responsible party (contractor or principal employer) under the Central or State rules.
  • MSME Form 1 (companies): outstanding payments to micro and small enterprises beyond 45 days, due 30 April (October to March) and 31 October (April to September).
  • Vendor compliance audit: a principal-employer practice, aligned to the contractor return cycle.

3.4 Annual corporate and labour cycles

Tax and corporate

  • 15 June: annual salary TDS certificate (Form 130), as specified in the Rules.
  • 30 June: Form DPT-3 (return of deposits), where applicable.
  • 30 September: AGM for companies with a 31 March year-end; tax audit report where applicable.
  • Within 30 days of AGM: financial statements (Form AOC-4). Within 60 days of AGM: annual return (Form MGT-7).
  • 31 July / 31 October: income-tax return for non-audit and audit cases respectively, subject to any extension notified for the year.
  • 31 December: annual GST return (GSTR-9) and reconciliation statement where applicable.

Labour and workplace

  • Bonus: within eight months of financial year-end (30 November for a March year-end).
  • Annual returns under the Labour Codes: prescribed in the Central and State rules. Under the legacy regime, factory annual returns fell due by 31 January and many State PT annual returns by 31 March or 30 June. Confirm the date for each State.
  • Registration, licence and consent renewals: each has its own expiry. Load the expiry date and a 60-day renewal start date for each location.
  • POSH annual report: to the employer and the District Officer, with disclosure in the company's annual report where required.
  • Health check-ups, safety audits and committee reconstitution: annual cycles under the OSHWC framework and the State rules.
  • Gratuity and leave provisioning: annual actuarial valuation, with monthly accrual.
  • Labour Welfare Fund annual dates: for example, Karnataka's annual contribution by 31 January.

3.5 Master calendar architecture

The calendar should be a register, not a list of dates. Each row should carry the following fields:

  1. Obligation ID and description
  2. Legal entity, location and State
  3. Statute and portal
  4. Periodicity and legal due date
  5. Internal target date (typically two working days before the legal date for payments, five for returns)
  6. Preparer, approver and escalation owner
  7. Input dependencies (for example, payroll freeze, TAN, UAN data)
  8. Evidence required (challan, acknowledgement, portal screenshot)
  9. Status and completion date
  10. Source of the rule and effective date (notification or circular)

Control design

  • Single source: one register for all entities and States, with filters by owner, State and statute.
  • Automated alerts: alerts at 10, 5 and 2 working days before the internal target date, escalating to the approver and then the department head.
  • Holiday logic: compute due dates against State and bank holidays, but do not rely on holiday extensions unless the authority has notified one.
  • Rule change log: record each notification, the effective date, and the calendar rows changed, with a named owner for monitoring State amendments.
  • Evidence-gated closure: a row closes only when the acknowledgement is attached.
  • Management dashboard: on-time filing rate, open items by owner and State, items due in the next 30 days, and notice register.

4. Table / Checklist

Frequency / PeriodicityGoverning Statute / PortalMandatory Compliance Action ItemStatutory Due Date
MonthlyCode on Wages, 2019Pay monthly wages; issue wage slips7th of next month
MonthlyCode on Wages, 2019Pay all dues on exitWithin two working days of separation
MonthlyIncome-tax Act, 2025, Section 392 (e-payment)Deposit TDS on salary7th of next month (30 April for March)
MonthlyIncome-tax Act, 2025, Section 393 (e-payment)Deposit TDS on contractor, professional, rent and other payments7th of next month (30 April for March)
MonthlyGST portalFile GSTR-1 (monthly filers)11th of next month
MonthlyGST portalFile GSTR-3B and pay tax (monthly filers)20th of next month
MonthlyEPFO Unified PortalFile ECR; pay EPF, EPS, EDLI and administration charges15th of next month
MonthlyESIC Employer PortalFile contribution; pay15th of next month
MonthlyState PT portalDeduct, file and pay Professional TaxState-specific (examples: 10th Telangana; 15th Gujarat; 20th Karnataka; 21st West Bengal; month-end Maharashtra for larger employers)
MonthlyState LWF (where monthly)Pay contributionAs notified by the State
MonthlyInternal controlReconcile payroll to challans, portals and bankMonth-end close
MonthlyContract and OSHWC frameworkCollect contractor wage and PF/ESI proof before releasing invoicesBefore each invoice payment
QuarterlyIncome-tax Rules, 2026 (TRACES)File Form 138 (salary TDS statement)31 Jul, 31 Oct, 31 Jan, 31 May
QuarterlyIncome-tax Rules, 2026 (TRACES)File Form 140 (resident non-salary) and Form 144 (non-resident)31 Jul, 31 Oct, 31 Jan, 31 May
QuarterlyIncome-tax Rules, 2026 (TRACES)File Form 143 (TCS), where applicable31 Jul, 31 Oct, 31 Jan, 31 May
QuarterlyIncome-tax ActPay advance tax15 Jun, 15 Sep, 15 Dec, 15 Mar
QuarterlyGST portal (QRMP)File quarterly GSTR-1; GSTR-3B for the quarter13th after quarter-end; 22nd or 24th after quarter-end
QuarterlyInternal controlContractor licence and proof review; safety and committee records; State rule update checkQuarter-end
Half-yearlyESIC frameworkRe-test wage eligibility at period start1 April and 1 October
Half-yearlyState LWF (where half-yearly)Pay contributionExample: 30 June and 31 December (Maharashtra)
Half-yearlyOSHWC / contract labour rulesContractor return and principal employer verificationPer the applicable rules (legacy: shortly after each half-year)
Half-yearlyCompanies Act (MSME Form 1)Report outstanding payments to micro and small enterprises30 April; 31 October
AnnualIncome-tax Rules, 2026Issue annual salary certificate (Form 130)15 June (as specified in the Rules)
AnnualCode on Wages, 2019Pay statutory bonusWithin eight months of year-end (30 November for March year-end)
AnnualCompanies Act (AGM)Hold AGM30 September (March year-end)
AnnualCompanies Act (AOC-4, MGT-7)File financial statements; annual return30 days and 60 days after AGM
AnnualIncome-tax ActTax audit report; income-tax return30 September; 31 July (non-audit) and 31 October (audit), subject to notified extensions
AnnualGST portalFile GSTR-9 and reconciliation, where applicable31 December
AnnualState LWF (where annual)Pay contributionExample: 31 January (Karnataka)
AnnualState PTFile annual return or pay enrolment fee, where the State requiresState-specific
AnnualOSHWC framework / State rulesAnnual return; safety audit; health check-upsAs prescribed (legacy factory return: 31 January)
AnnualPOSH ActInternal Committee annual report to the District OfficerAs prescribed
AnnualState and local authoritiesRenew Shops and Establishments, factory, contract labour, trade licence and pollution consentsPer certificate expiry; start renewal 60 days earlier
Event-drivenEPFO, ESICRegister within the statutory period after crossing the threshold; update joiner and exit dataESIC: 15 days of applicability; EPF: per Scheme
Event-drivenAuthority noticesAcknowledge, assign owner, respond by the notice datePer notice

Master calendar readiness checklist

  • Every entity, location and State listed with registrations, TANs, codes and licence expiry dates
  • Every obligation above mapped to an owner, an approver and an internal target date
  • State PT and LWF dates verified from current notifications and sourced in the register
  • Alerts configured at 10, 5 and 2 working days
  • Evidence-gated closure in place
  • Rule change log with a named monitor for each State
  • Dashboard reviewed weekly by Finance and HR heads

5. Common Mistakes

  1. Treating deadlines as transactions, not as a system. A due date is handled when someone remembers it. Consequence: periodic defaults, no accountable owner, and the same errors repeating across cycles. In aggregate, interest, damages and fees accumulate across statutes.
  2. Missing State-specific Professional Tax calendar variances. Applying one State's date, slab or return format to all locations. Consequence: interest and penalties in the affected State, and recurring short deposits that compound month by month.
  3. Relying on manual calendar reminders. Personal calendars and spreadsheets that depend on one person. Consequence: a missed date when that person is absent or leaves, with no escalation path.
  4. Using outdated forms and sections. Filing or planning under Form 24Q, Section 192 or Form 16 for Tax Year 2026-27. Consequence: rejected statements, challan code errors, and TRACES defaults.
  5. Ignoring the Rs 25,000 EPF ceiling and ESIC period reset. Calendars that carry the date but not the parameter change. Consequence: correctly timed but short contributions, then arrear filings with interest.
  6. Paying on the last day. Initiating payment on the due date and hitting a portal or bank failure. Consequence: a late payment with interest and damages, and a weak position when the cause is a known risk that the calendar should have buffered.
  7. Omitting licence and registration expiries. Factory, contract labour, Shops and Establishments, trade licence and pollution consents are tracked in different departments. Consequence: operating without a valid licence, penalties and inspection findings.
  8. No event-driven entries. Crossing a headcount threshold, opening a branch or engaging contract workers without triggering registration and calendar updates. Consequence: late registration, back-dated contribution demands and penalties.
  9. No rule-change process. State amendments, new notifications and circulars never reach the calendar. Consequence: correctly executed filings on wrong dates, rates or forms.
  10. Closing items without evidence. Marking filed without acknowledgement, or without payment confirmation. Consequence: inability to prove timely compliance in an inquiry, and unnoticed rejections.
  11. Late-filing clean-up in bulk. Letting several periods lapse and filing together. Consequence: cumulative late fees, interest and damages, and a heightened chance of a notice or inspection.

6. Action Plan: 30-60-90 Day Master Calendar Implementation

Days 1-30: Inventory and baseline

  1. Entity and location master: list every legal entity, location and State, with TAN, GSTIN, EPF and ESIC codes, PT and LWF registrations, establishment and factory licences, and expiry dates.
  2. Obligation inventory: for each entity and location, list every obligation under Section 4 that applies, using the headcount and geography triggers in Section 2.
  3. Current-state mapping: record who owns each obligation today, which tools they use, and the last 12 months of filing dates.
  4. Gap and default review: identify late filings, open notices, pending registrations and licences that have expired or are about to expire.
  5. Immediate corrections: file overdue returns and clear defaults, starting with items with personal-liability exposure (deducted but not deposited).
  6. Verify State dates: source each PT, LWF and licence date from the current State notification and record the reference.

Days 31-60: Build and configure

  1. Design the register: use the field set in Section 3.5, with internal target dates, owners, approvers and escalation owners.
  2. Load the calendar: enter all recurring, periodic, annual and licence obligations for the next 12 months, with holiday logic.
  3. Set the alert rules: alerts at 10, 5 and 2 working days before the internal target date, with escalation to the approver and then the department head.
  4. Define evidence standards: the document that proves each obligation closed, and where it is stored.
  5. Pilot: run two live cycles (a monthly anchor and a quarterly return) through the new register and fix the gaps.
  6. Parameter updates: reflect the Rs 25,000 EPF ceiling, ESIC period dates, new TDS forms and sections, and State changes in the relevant rows.

Days 61-90: Embed, govern and verify

  1. Go live across all entities and States, retiring personal and departmental trackers.
  2. Governance rhythm: weekly 15-minute review of items due in the next 14 days, a monthly leadership report, and a quarterly audit of the register against statutory sources.
  3. Rule-change control: appoint a monitor per State and per central statute, with a change log and an update turnaround.
  4. Event triggers: link headcount, new-location and new-contractor events from HR and procurement to the register.
  5. Mock audit: pick ten obligations at random and produce the filing, payment evidence and approver trail within a set time.
  6. Metrics: on-time rate, items closed with evidence, days of buffer, open notices and exposure, reported to leadership.

Frequently asked questions

Build the buffer first: set internal payment targets at least two working days ahead. If a failure still occurs, keep time-stamped screenshots and error messages, try other payment channels the portal supports, and write to the authority's helpdesk the same day. File and pay as soon as service resumes. An outage can support a reasonable-cause plea, but it does not extend the legal date unless an extension is notified.

Do not force one date. Build a State master table with the statute, State, due date, periodicity, source notification and effective date, then generate the internal target dates from it. Apply a single internal rule across all States, such as paying two working days before the earliest legal date, and let the register display each State's actual date. Review the master table quarterly and on every State amendment.

First, list every affected period with the correct due date, actual filing and payment dates, and any shortfall. Second, regularise: file delayed returns, pay shortfalls with interest and make correction filings (a supplementary ECR, a TDS correction statement). Third, document the cause and the new control. Finally, correct the calendar row, check other States and entities for the same error, and log the change.

Do not assume an extension. Income-tax provisions may allow filing on the next working day, but social security, GST, State levies and wage deadlines depend on the specific statute or circular. Set your internal target date before the holiday and treat any holiday relief as a bonus when the authority has expressly notified it.

Store each rule with its source, effective date and status (final, draft, pending State notification). Where a State has not finalised its rules, record the legacy date as the interim date, flag it for review, and assign an owner to monitor. When the State notifies the new rule, update the row, log the change, and re-run the dependency check on payroll and returns.

MA
Still have a question?Talk to our compliance expert. The first consultation is free.
Free consultation

Let's simplify your compliance.

Tell us about your business. Our team will help you understand your compliance requirements and identify the right support.